27/6/14 - Today we had our PCI. It went for about 2 hours. Some of the items that will need to be fixed/finished before handover include:-
* Scratches on the timber floor
* Scratch on top of stacker door
* Stacker door wont open
* Scratch on dishwasher door
* Chips in the wine rack
* Few stains on the carpet
* Replace glass in front door
* Marks / chips in front door
* Splashback tiles in powder room are wrong
* Locks and handles to be installed on some of the doors
* Cavity door catching
* Realign a few doors
* Paint / plaster touch up internally
* Paint / render touch ups externally
* Fix section above front window
* Redo timber feature on portico
* Scratch on bedroom window
*install fly screens
* install tiles under bath hob
Hopefully all the items can be fixed without too much drama, and we will get the keys on Thursday 10th July!