After 170 Tonne of fill was removed
Friday, 31 January 2014
Site Cut
Yesterday we were suprised to find out off one of our lovely neighbours that there was an excavator on our site working! Our SS called us shortly after to let us know what was happening and what he expects to happen in the next week or so. We have a fair bit of extra fill that needs to be taken away (at our cost) as we have asked the excavator to cut as close as possible to the boundary around the block to save us time later on, and for the fact that getting a machine in later will be virtually impossible.